Sustainable Workspaces
County Hall, London
U-Build, 2023
At U-Build, I coordinated the relocation of a modular circular office fit-out at County Hall, managing the team, components, and build sequence while problem-solving on site.
Sustainable Ventures
Whilst working for U-Build in 2021 and up until 2024, I supported the team in completing a large circular office fit-out design, suitable for re-use and historic building fabrics. In 2021, U-Build worked with Sustainable Workspaces to create a modular, removable partition system for a co-working space on the 3rd floor of County Hall, Southbank. The idea was to relocate each partition system from 3rd to 5th floor of County Hall, when a complete renovation of the derelict upper floor space was complete. Two years later I was able to support the co-ordination and construction of the 5th floor sustainable office space.
I was part of the project management team for the relocation and reinstallation of Sustainable Workspaces, I coordinated the move of a modular, reusable partition system from the 3rd to the 5th floor of County Hall. My responsibilities included developing detailed on-site instruction manuals for the build team, outlining where each component, fixing, and fitting was to be installed, and creating a comprehensive logistics plan covering storage, sequencing, and material flow. As part of the fire safety strategy, I was responsible for overseeing the intumescent application to each partition, ensuring the removable partitions complied with Building Regulations and quality control. I supported clear communication between the client, U-Build team, and subcontractors, overseeing risk management, scheduling, and quality control. This role allowed me to develop my leadership qualities to support the delivery of a complex circular construction project within a heritage building.



